Intercultural Design - Task 02
FEBRUARY - APRIL (Week 1 - Week 7)
Aidi Rafiq | 0353422 | Bachelor of Design (Honours) in Creative Media
INTERCULTURAL DESIGN
INSTRUCTIONS
TIMELINE
February 19 & 23 WEEK 3
• Proposal Presentation
• Proposal approval
February 26 & March 1 WEEK 4
• Data Collection week
• Field study trip and data collection
• Data compilation
March 4 & 8 WEEK 5
• Data Compilation
• Data presentation and transformation
• Artefact building
March 11 & 15 WEEK 6
• Self Directed
• Artefact progression consultation
• Artefact building
March 18 & 22 WEEK 7
• Final Project Presentation
• Project progression and consultation
WEEK 3
fig 1.0 Group 8 Proposal for culture sensitivity
My group went to Osaka, Japan for our research. We decide to write our
proposal about Geisha to relate to 'Culture Sensitivity'. Then we decide to
explore more and therefore we got the idea of "Navigating Malaysian's
manner: A Guide to Do's and Don't for Culture Etiquette (using Japan as an
example)"
fig 1.1 Group 8 Proposal for our collection data
This is our proposal for our collection data. We collect everything that we have got from Japan and make that as our proposal. For outcome we are planning to produce a guide book for tourist or anyone to navigate Malaysian's manner.
fig 1.2 Group 8 FINALIZE GUIDE BOOK
This is our finalize guide book, we have combine and design all the date
that we have collected and apply it in our guide book. The way we have
designed this guide book is to express it as if its a magazine so it would
be eye catching from afar. We want the page to be interesting and
enjoyable to read rather than reading of a essay.
Reflections
Overall this module is very fun, especially we have the opportunity travel to japan and collect our data from there. It was my first time in Japan and I really missed it. Other than that, this module have teach me different culture and rules that different country has. That is what makes the country original and unique.
Comments
Post a Comment